Want to help translate? Switch to English under Step 1, and check ‘edit translation’ (more explanation in the FAQ). Even if you translate just a few lines, this is still very much appreciated! Remember to log in if you would like to be credited for your effort. If you’re unsure where to start translating, please see the list of Most wanted translations.

2016 Q1-3 wind power installations and production by province

Published on: November 18, 2016

Original title: 2016年前三季度风电并网运行情况
Links: Original CN (link).
Compare current installations with the target of 30,830 MW (for all of 2016), by province, in the National wind power development and construction plan 2016 (link).

 

From January to September, national additional grid connected wind power capacity was 10 GW; by the end of September, cumulative grid connected capacity was 139 GW, an increase of 28% on the same period last year;from January to September, national wind power production was 169.3 TWh, an increase of 27% on the same period last year;the average productivity was 1251 full-load hours, down 66 hours on the same period last year;wind power curtailment was 39.47 TWh, an increase of 24.7 TWh;average wind power curtailment was 19%, an increase of 9.5 percentage points。

From January to September, the provinces with relatively high capacity additions were Yunnan (2.26 GW), Jiangsu (1.04 GW), Shandong (930 MW) and Jilin (610 MW)。Provinces with relatively high average productivity of wind power were Yunnan (1712 full-load hours), Sichuan (1643 hours), Guangxi (1614 hours) and Fujian (1602 hours);Provinces with relatively high average productivity of wind power were Gansu (870 hours), Guangdong (904 hours), Xinjiang (946 hours) and Jilin (951 hours)。

2016 Q1-3 wind power installations and power production

Province New grid-connected capacity (MW) Total grid-connected capacity (MW) Power output dispatched (GWh) Wind power curtailment (GWh) Wind power curtailment rate (%) Full load hours
Total 10,000 139,340 169,320 39,470 19% 1251
Beijing 40 190 250 1321
Tianjin 0 280 450 1587
Hebei 350 10,570 14,660 1,680 11% 1418
Shanxi 460 7,150 9,260 910 9% 1332
Shandong 930 8,140 10,430 1356
Inner Mongolia 390 24,640 33,260 9,580 23% 1360
Liaoning 410 6,800 9,190 1,600 15% 1381
Jilin 610 5,050 4,770 2,370 34% 951
Heilongjiang 270 5,300 6,170 1,360 18% 1182
Shanghai 0 610 940 1533
Jiangsu 1,040 5,160 6,620 1449
Zhejiang 50 1,090 1,570 1480
Anhui 330 1,690 2,470 1566
Fujian 370 2,090 3,150 1602
Jiangxi 250 920 1,250 1455
Henan 80 990 1,290 1354
Hubei 410 1,760 2,420 1529
Hunan 380 1,940 2,730 1536
Chongqing 0 230 320 1422
Sichuan 310 1,040 1,450 1643
Shaanxi 0 1,690 1,920 1411
Gansu 250 12,770 10,840 8,930 46% 870
Qinghai 120 590 800 1426
Ningxia 100 8,320 8,740 1,750 17% 1064
Xinjiang 150 17,060 16,050 10,830 41% 946
Tibet 0 10 10 1354
Guangdong 120 2,580 2,330 904
Guangxi 190 620 830 1614
Hainan 0 310 380 1225
Guizhou 140 3,370 3,840 1232
Yunnan 2,260 6,380 10,930 460 4% 1712

Note:Statistics as reported by the China Electricity Council and as dispatched by the grid companies。