All translations on this site are unofficial and provided for reference purpose only.

To view translations, select English under Step 1 (at the right of the screen). Not every item is (fully) translated. If you’re still seeing Chinese, you can use machine translation, under Step 2, to make sense of the rest.

Want to help translate? Switch to English under Step 1, and check ‘edit translation’ (more explanation in the FAQ). Even if you translate just a few lines, this is still very much appreciated! Remember to log in if you would like to be credited for your effort. If you’re unsure where to start translating, please see the list of Most wanted translations.

Circular on the construction of solar thermal power generation demonstration projects

Published on: September 13, 2016

Original title: 国家能源局关于建设太阳能热发电示范项目的通知 国能新能[2016]223号
Links: Original CN (url).

NEA Dept. of New Energy [2016] No. 223

National Energy Administration

Circular on the construction of solar thermal power generation demonstration projects

To Development and Reform Commissions (Energy Administrations) of Qinghai Province, Gansu Province, Hebei Province, Inner Mongolia Autonomous Region, and Xinjiang Autonomous Region, Energy Authorities of North China and Northwest China, Energy Regulatory Offices of Gansu and Xinjiang, the State Grid Corporation, Hydropower Planning and Design Institute, Electric Power Planning and Design Institute, and the National Renewable Energy Center:

In accordance with the "Circular of the National Energy Administration on Organization of solar thermal power demonstration projects" (NEA Dept of New energy [2015] No. 355), in order to promote the industrialization of solar thermal power generation technology in China, after assessment by a committee of experts, a list with the first batch of solar thermal power generation demonstration projects has been determined。Notice is hereby given of relevant matters and requirements as follows:

1. Through organization of an review by experts of projects recommended by the relevant regional Development and Reform Commissions (Energy Administrations), the first batch of a total of 20 solar thermal power demonstration projects has been determined, with a total installed capacity of 1,349 MW, distributed over Qinghai Province, Gansu Province, Hebei Province, Inner Mongolia Autonomous Region and Xinjiang Autonomous Region。See the Annex for project details。

2. Development and Reform Commissions (Energy Administrations) of each province (autonomous region) is responsible for guidance and supervision of the construction of the demonstration projects。During construction of demonstration projects, there should be strict adherence to the technical specifications committed to when participating in the review (for specifications see the Annex)。The Hydropower Planning Institute is requested to organize experts to monitor and evaluate the technology roadmaps and technical specifications during the implementation of the projects。

3. The demonstration projects should complete registration by September 30, 2016, and start construction as soon as possible。The Development and Reform Commissions (Energy Administrations) of relevant provinces (autonomous regions) are requested to track project progress, and submit quarterly status reports to the National Energy Administration。For projects not registered on time and projects that have not started construction long after registration, the Development and Reform Commission (Energy Administration) of the relevant province (autonomous region) should report to the National Energy Administration, and put forward suggestions for handling the situation。

4. All demonstration projects should in principle be completed and put into production by the end of 2018。After project construction has been completed, the project developer shall promptly submit the acceptance test plan to the Development and Reform Commission (Energy Administration) of the province (autonomous region). The Development and Reform Commission (Energy Administration) of the relevant province (autonomous region) shall, in conjunction with the relevant branch organizations of the National Energy Administration, guide the project acceptance process, and promptly submit the project acceptance report to the National Energy Administration。

5. During the construction process of the demonstration projects, the project developer, construction enterprises, equipment manufacturers and other relevant parties should strengthen cooperation, jointly research, and form integrated technical capabilities, and further ensure that demonstration projects complete construction and are put into operation on time, and generate industrialization effects as soon as possible。

6. Relevant power grid companies should act in unison in planning construction of supporting power grid construction for the demonstration project, and in accordance with demonstration project's construction schedule, timely carry out construction of the supporting grid for power delivery, and further, ahead of time, analyze the operating schedule for when the demonstration project comes online, to ensure that the power generated by the demonstration project may be fully consumed。

7. In order to ensure the technological advancement and industrialization of solar thermal power generation projects, and to avoid reckless investment and low-quality, redundant construction, over the "13th FYP" period, all solar thermal power generation projects should be incorporated into the unified national administrative management for solar thermal power generation demonstration projects organized by the National Energy Administration, and only those projects incorporated in the list of demonstration projects can enjoy the national electricity price subsidies。

Annex:Solar thermal power generation demonstration projects list

National Energy Administration

September 13, 2016

 

Annex

Solar thermal power generation demonstration projects list

No. Project name Project developer Technology roadmap Technology source and systems integration companies System conversion efficiency (company commitment)
Tower type
1 Qinghai Supcon Co., Ltd. molten salt solar power tower 50 MW solar thermal power project, Delingha Qinghai Supcon Solar Power Co., Ltd Tower with molten salt, 6 hours of molten salt thermal storage Zhejiang Supcon Solar Power Co., Ltd 18%
2 Beijing Shouhang IHW Resources Saving Technology Co., Ltd 100 MW molten salt tower thermal power generation demonstration project, Dunhuang Beijing Shouhang IHW Resources Saving Technology Co., Ltd Tower with molten salt, 11 hours of molten salt thermal storage Beijing Shouhang IHW Resources Saving Technology Co., Ltd 16.01%
3 Power China Northwest Engineering Co., Ltd 50 MW molten salt tower thermal power project, Gonghe County Power China Northwest Engineering Co., Ltd Tower with molten salt, 6 hours of molten salt thermal storage Zhejiang Supcon Solar Power Co., Ltd / Power China Northwest Engineering Co., Ltd 15.54%
4 China Power Engineering Consultants Group Northwest Electric Power Design Institute Co., Ltd. 50 MW molten salt tower CSP Project, Hami City Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group Tower with molten salt, 8 hours of molten salt thermal storage Zhejiang Supcon Solar Technology Co., Ltd. / Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group 15.5%
5 State Power Investment Huanghe hydropower development Co., Ltd 135 MW Direct Steam Generation tower CSP project, Delingha State Power Investment Huanghe hydropower development Co., Ltd Tower with water as working fluid, 3.7 hours of molten salt heat storage BrightSource Energy Inc. (US) / Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group 15%
6 China Three Gorges New Energy Co., Ltd. 100 MW Golden tower molten salt tower CSP project China Three Gorges New Energy Co., Ltd. Tower with molten salt, 8 hours of molten salt thermal storage Beijing Shouhang IHW Energy Saving Technology Co., Ltd. / Power China Northwest Engineering Co., Ltd 15.82%
7 Dahua Engineering Management (Group) Co., Ltd. 50 MW Direct Steam Generation tower CSP project, Shangyi county Dahua Engineering Management (Group) Co., Ltd., Institute of Electrical Engineering of the Chinese Academy of Sciences Tower with water as working fluid, 4 hours of molten salt heat storage Institute of Electrical Engineering of the Chinese Academy of Sciences 17%
8 Yumen Xinneng No. 1 Solar Thermal Power Generation Co., Ltd. 50 MW molten salt tower CSP project Yumen Xinneng No. 1 Solar Thermal Power Generation Co., Ltd Tower with molten salt, beam-down system with 6 hours of thermal storage Shanghai Parasol New Energy Co., Ltd. / Jiangsu XinChen Solar Thermal Technology Co., Ltd. 18.5%
9 Beijing Guohua Electric Power Co., Ltd. 100 MW molten salt tower CSP project, Yumen Beijing Guohua Electric Power Co., Ltd. Molten salt tower, 10 hours of molten salt heat storage Beijing Shouhang IHW Resources Saving Technology Co., Ltd 16.5%
Trough type
1 Changzhou Royaltech Solar Thermal Power Equipment Co., Ltd. 50 MW Thermal oil parabolic through CSP project, Yumen East Town Changzhou Royaltech Solar Thermal Power Equipment Co., Ltd. Oil HTF trough, 7 hours of molten salt heat storage Changzhou Royaltech Solar Thermal Power Equipment Co., Ltd. 24.6%
2 Shenzhen Gold Vanadium Energy Technology Co., Ltd. 50 MW molten salt parabolic trough CSP project, Akesai Shenzhen Gold Vanadium Energy Technology Co., Ltd. Molten salt HTF trough, 15 hours molten salt heat storage Tianjin Binhai Solar Thermal Power Generation Investment Co., Ltd. 21%
3 Rayspower Energy Group Co., Ltd. 50 MW thermal oil parabolic through CSP project, Yumen East Town Rayspower Energy Group Co., Ltd. Oil HTF trough, 7 hours of molten salt heat storage Rayspower Energy Group Co., Ltd. 24.6%
4 Inner Mongolia China Nuclear Energy Technology & Royaltech Solar Thermal Power Equipment Co., Ltd 100 MW thermal oil parabolic through CSP project, Urad Middle Banner Inner Mongolia China Nuclear Energy Technology & Royaltech Solar Thermal Power Equipment Co., Ltd Oil HTF trough, 4 hours of molten salt heat storage Changzhou Royaltech Solar Thermal Power Equipment Co., Ltd. / Inner Mongolia China Nuclear Energy Technology & Royaltech Solar Thermal Power Equipment Co., Ltd 26.76%
5 CGN Solar Energy Delingha Co., Ltd. 50 MW thermal oil parabolic through CSP project CGN Solar Energy Delingha Co., Ltd. Oil HTF trough, 9 hours of molten salt heat storage CGN Solar Energy Development Co., Ltd. 14.03%
6 CECEP Gansu Wuwei Solar Energy Power Generation Co., Ltd. 100 MW thermal oil parabolic through CSP project, Gulang county CECEP Gansu Wuwei Solar Energy Power Generation Co., Ltd. Oil HTF trough, 7 hours of molten salt heat storage Changzhou Royaltech Solar Thermal Power Equipment Co., Ltd. / CECEP Solar Energy Investment Co., Ltd. 14%
7 Zhongyang Zhangjiakou Chabei Energy Co., Ltd. 64 MW Molten salt parabolic through CSP project Zhongyang Zhangjiakou Chabei Energy Co., Ltd. Molten salt HTF trough, 16 hours molten salt heat storage Skyfuel Inc. / Zhongyang Zhangjiakou Chabei Energy Co., Ltd. 21.5%
Fresnel type
1 Lanzhou Dacheng Technology Co., Ltd. 50 MW Molten salt linear Fresnel CSP demonstration project, Dunhuang Lanzhou Dacheng Technology Co., Ltd. Molten salt Fresnel, 13 hours of molten salt heat storage Lanzhou Dacheng Technology Co., Ltd. 16.7%
2 North United Power Co., Ltd. 50 MW thermal oil Fresnel CSP project, Urad Front Banner Huaneng North United Power Co., Ltd. Oil HTF Fresnel, 6 hours of molten salt heat storage Clean Energy Technology Research Institute of China Huaneng Group 18.5%
3 CITIC Zhangbei New Energy Development Co., Ltd. 50 MW Water HTF Fresnel CSP project CITIC Zhangbei New Energy Development Co., Ltd. Water HTF Fresnel, 14 hours of heat storage in solid state formulated concrete Beijing Terasolar Solar Thermal Technology Co., Ltd. 10.5%
4 Zhangbei Huaqiang Zhaoyang Energy Co., Ltd. 50 MW Water HTF Fresnel CSP project, Zhangjiakou Zhangbei Huaqiang Zhaoyang Energy Co., Ltd. Water HTF Fresnel, 14 hours of heat storage in solid state formulated concrete Beijing Terasolar Solar Thermal Technology Co., Ltd. 11.9%

 

Tweet about this on TwitterShare on RedditShare on LinkedInEmail this to someonePrint this page